Gazzaniga BG, Italië
Climate for plant cultivation
For a Freesia grower in Westland, Induct realized the climate for the cultivation rooms. Freesias can bloom only when day length, temperature and humidity are just right. Normally that is only a period in spring and fall. With an out-of-the-box system, Induct realized a climate for growing these flowers in layers under perfect conditions. As a result, the flowers bloom

Westland (NL)
Climate for plant cultivation
For a Freesia grower in Westland, Induct realized the climate for the cultivation rooms. Freesias can bloom only when day length, temperature and humidity are just right. Normally that is only a period in spring and fall. With an out-of-the-box system, Induct realized a climate for growing these flowers in layers under perfect conditions. As a result, the flowers bloom

Brabant
Indoor climate baby food manufacturer
The existing installation was modified and equipped with cooling and dehumidification, so that now the indoor climate is optimal all year round. The challenge with this project was not the technology, but the very logistical operation was complex. After all, the work must be carried out in a clean production environment, where work also continued as usual. Barring some weekend

Frankrijk
Longer shelf life of bread
The cooling of fresh bake-off breads takes place in a large carousel, in which the breads cool under the right conditions in a clean environment. The latter is the expertise of Induct and here Induct has developed a unique concept where by means of the right air flows and with the use of UV-C technology, the bread cools down exactly

Zuid Holland
Climate chamber for sandwiches
Here, after the bread comes out of the oven sterile, it is cooled, sliced and packaged. Induct ensures during this process that the product does not come into contact with outside influences. Until the package is sealed, Induct provides a bubble of 100% sterile air around the product. This way, mold and bacteria don’t get a chance to reach the

Sassenheim (Nederland)
Pollux Sassenheim
In an existing building, the systems for providing sterile clean air of just the right temperature and humidity are incorporated. Induct works out the detail design for its client. Together with other sister companies from The Vink Group, Induct realizes the air treatment, air conditioning and the necessary cooling, heating and steam piping. In record time, the existing warehouse is

Amsterdam
Wacker Steam boilers
Since new construction in 1988, the Vink Groep has continued to be involved in large and small renovations for this client.

Rosdorf (Duitsland)
Tierstall Rosdorf
Inducht has realized accommodations where studies are conducted. As general contractor, Induct designed and built the entire HVAC and control system. To have minimal impact on daily operations, the renovation was completed in a short period around the turn of the year.

Nijverdal
Spinning Jenny
The driving force behind Spinning Jenny is ambitious businesswoman Paula Gerritsen. About Spinning Jenny, she says, “A lot of textiles are thrown away unnecessarily in the world. We find that incredibly unfortunate. And it doesn’t have to be at all. We have been recycling plastic, cans and paper for a long time. Why not also with textiles? The technique is

Nieuwegein
Completion of full lab Synergy Health Utrecht
Induct was given the clean task here of providing the architectural and installation design for the building transformation and also realizing it. The deadline for the project was Oct. 1, because Synergy Health Utrecht BV had to move from the former location by then. This meant that by this date the entire lab had to be moved and up and

Nigeria
Working toward a clean production space in Nigeria
In late 2019, the first push was made to convert the existing hall into a clean food safe production area. The ceiling and part of the walls were realized quickly at the time due to the work of the production plant supplier. After installing the production equipment in 2020, Induct’s project team sealed the remaining walls and ceilings. Thus, 700m2